This is a summary of the renovations that have taken place to our centre:
1. Signs installed outling permission for Salvation Army to enforce their RED ZONE POLICY 2. Signs installed outling London Police No gangs, no colours, etc. policy 3. Two black wrought iron gates installed on North side of Street Connection property, facilitated by Marvin Maxmenko 4. Front concrete entrance replaced by Weir Concrete with coloured and stamped concrete by Seamus Weir 5. Garbage container platform replace by Weir Concrete with coloured concrete by Seamus Weir 6. Concrete supplied by LaFarge 7. Sealer supplied by Williams Form Hardware





Facebook
Twitter
Myspace
Digg
StumbleUpon
Yahoo
Googlize this
Wikio